Indicated on
16.04.2020 | Категория: Обустройство участка
As a rule, the drying process takes about two days, this is indicated on the packaging of enamel, along with the start of the operation of the bath after the update.
As a rule, the drying process takes about two days, this is indicated on the packaging of enamel, along with the start of the operation of the bath after the update.