Is performed in parallel
30.03.2020 | Категория: Обустройство участка
Please note: the installation of partitions of the 1st floor is performed in parallel to its construction.
Next begin to make ceilings of the 2nd floor.
Please note: the installation of partitions of the 1st floor is performed in parallel to its construction.
Next begin to make ceilings of the 2nd floor.