The boards are
17.04.2020 | Категория: Обустройство участка
First, pegs are driven into the trench, and then the boards are attached to them. The main thing is that there are no cracks through which concrete can spill.
First, pegs are driven into the trench, and then the boards are attached to them. The main thing is that there are no cracks through which concrete can spill.