Tightly pressed
27.04.2020 | Категория: Обустройство участка
The loaded surface is dried and aligned with putty. Then the surface is again dried for 8-12 hours. Then the plates are tightly pressed against the wall.
The loaded surface is dried and aligned with putty. Then the surface is again dried for 8-12 hours. Then the plates are tightly pressed against the wall.