12-14 hours
27.03.2020 | Категория: Обустройство участка
At the end of laying tiles and dividers, check that all seams are the same. The width of the seams should be within 2-3 mm.
After drying the tiles (12-14 hours), the separators are removed and the seams begin to grout.