Completely dries

15.06.2020 | Категория: Обустройство участка

On the contrary, the drying period is quite short-after the 2nd day, the wall cladding completely dries. When arranging the floors, the drying period is about the same, but it is recommended to wait with their operation for about 2 weeks-this period will be required to turn the flooring into a monolith.