Of the pool
22.05.2020 | Категория: Обустройство участка
Earthwork. Preparation of the pit: manually or special equipment, if there is the possibility of its entrance. Excavation from the site;
The end of the preparatory phase of the construction of the pool is to fill the bottom of the pit with a pillow of sand, arranging a concrete slab of the base.