Previous flooring, if
03.04.2020 | Категория: Обустройство участка
After the project is compiled and agreed, our employees begin to dismantle the previous structures, remove the old plumbing, remove the wallpaper from the walls, remove the previous flooring, if necessary, redevelop the rooms, and the windows are dismantled.