The side
08.07.2020 | Категория: Обустройство участка
The side edges should go to the wall by 10-15cm. Foam laying is laid on top of waterproofing. The flooring itself is starting to lay a cork tree from the right corner.
The side edges should go to the wall by 10-15cm. Foam laying is laid on top of waterproofing. The flooring itself is starting to lay a cork tree from the right corner.